Change trip stage

Change trip stage

An operation is able to customize their trip stages to assist in defining internal processes. To learn how to customize the stage access Configure trip stages, leg statuses and hard stops.

  1. Access the trip that requires a stage change. 

  2. Expand the trip feasibility by clicking the plus button. If the "Skip Pending Stage for Booked Quotes" is set to no when a quote is booked into a trip, the trip will be in the pending status. A trip in the pending status displays gray on the calendar. The pending status can be used as a placeholder on the calendar for all departments to be aware of the "potential" trip. 

3. Click the drop down and select the applicable stage. Stages are assigned an order number. They will display in the sequential order. 

Once the stage is successfully changed, it will display the stage name in the trip feasibility, by the trip number as well as in the list of trips and it will display the applicable stage color on the calendar. 

Ref: O-T22

    • Related Articles

    • Configure trip stages

      This article will cover: how to configure trip stages how to set permissions for trip stages how to set trip stages change controls SET UP TRIP STAGES Operations > Settings > Configuration has an option to Change Controls by Trip Stage or Leg Status. ...
    • Operations and Trip Configurations

      This article explains: Various settings related to operations on an overall account level CONFIGURATIONS To access these settings proceed to Operations from the main navigation, click on the settings tab and select "Configuration" Default Trip Type ...
    • Service Automation: Change Control Options

      This article will cover: Creation of Service Template related to Change Control Options Creation of Service Template related to Change Control Options This works just like the change control options in Stages. Services in any of the statuses selected ...
    • Revise quote and trip due to itinerary change

      Access the trip that needs to be adjusted. Click on the number for the quote with the green background (this is the quote that is currently booked). 3. Click on the copy quote button in the top right corner. 4. It will ask, would you like to copy ...
    • Create a Trip

      In this article you will learn how to create a trip from the following places: Trip/Flight Leg Search Page Scheduling Calendar Schedule Board Account Profile CREATE FROM OPERATIONS First, access the Trip or Flight Leg search pages from the Operations ...